UE E&C: 19% FALL IN 1Q NET PROFIT
 
Home >> Research
UE E&C: 19% FALL IN 1Q NET PROFIT

By Chia Jiunyang
Fri, 11 May 2012, 10:04:55 SGT

UE E&C (UEEC) reported its 1Q12 results last evening. 1Q12 revenue and net profit fell by 35% and 19% YoY to S$56.6m and S$4.0m respectively, mainly due to lower contribution from existing projects. That said, we note that revenue recognition of construction contracts are usually lumpy in nature, and may not be an accurate reflection on the progress made on DBSS/EC projects. Looking ahead, we fear that labour costs could rise given the stricter foreign manpower quota. Therefore, we eased our gross margin assumption to 17-18% (previously: 20%). This in turn lowered our SOTP-derived fair value to S$0.71 (previously S$0.82). Maintain BUY.

1Q results
UE E&C (UEEC) reported its 1Q12 results last evening. 1Q12 revenue and net profit fell by 35% and 19% YoY to S$56.6m and S$4.0m respectively, mainly due to lower contribution from existing projects. That said, we note that revenue recognition of construction contracts are lumpy in nature, and may not be an accurate reflection on the progress made on DBSS/EC projects. During the quarter, administrative cost also fell by 13.1% YoY to S$2.6m (1Q11: S$3.0m) due to an absence of listing expenses. Other income jumped to S$1m (1Q11: negligible) from fair value gains on investments.

Lumpy revenue recognition
Revenue recognition on construction contracts typically follows the percentage-of-completion (POC) method. However, INT FRS 115 requires the use of completion-of-construction (COC) method for DBSS and EC projects. This inevitably leads lumpy recognition of revenue (and profit) after a DBSS/EC project obtained TOP. To illustrate, UEEC’s FY11 net profit doubled to S$64.4m (9 months: S$30.2m) after its DBSS project, Park Central @ AMK, had obtained TOP in 3Q11. Looking ahead, we expect UEEC to begin work on its latest EC project in Pasir Ris (‘Watercolours’) in 2H12 and complete it by 2015. This also implies that the construction work done on the project may not be fully recognized until 2015.

Labour crunch
Besides the Pasir Ris EC project, UEEC is also working on the Austville Residences, National Continuing Education & Training Campus and MGM Grand Ho Tram projects. Although overall gross margin improved slightly to 15.1% (1Q11: 14.0%), we fear that labour costs could rise given the stricter foreign manpower quota for the construction industry. Therefore, we eased our gross margin assumption to 17-18% (previously: 20%). This in turn lowered our SOTP-derived fair value to S$0.71 (previously S$0.82). Maintain BUY.

 
Disclaimer for Research Report

This report is solely for information and general circulation only and may not be published, circulated, reproduced or distributed in whole or in part to any other person without the written consent of OCBC Investment Research Pte Ltd (“OIR” or “we”). This report should not be construed as an offer or solicitation for the subscription, purchase or sale of the securities mentioned herein or to participate in any particular trading or investment strategy. Whilst we have taken all reasonable care to ensure that the information contained in this publication is not untrue or misleading at the time of publication, we cannot guarantee its accuracy or completeness, and you should not act on it without first independently verifying its contents. Any opinion or estimate contained in this report is subject to change without notice. We have not given any consideration to and we have not made any investigation of the investment objectives, financial situation or particular needs of the recipient or any class of persons, and accordingly, no warranty whatsoever is given and no liability whatsoever is accepted for any loss arising whether directly or indirectly as a result of the recipient or any class of persons acting on such information or opinion or estimate. You may wish to seek advice from a financial adviser regarding the suitability of the securities mentioned herein, taking into consideration your investment objectives, financial situation or particular needs, before making a commitment to invest in the securities. In the event that you choose not to seek advice from a financial adviser, you should consider whether investment in securities and the securities mentioned herein is suitable for you. Oversea-Chinese Banking Corporation Limited (“OCBC Bank”), Bank of Singapore Limited (“BOS”), OIR, OCBC Securities Pte Ltd (“OSPL”) and their respective connected and associated corporations together with their respective directors and officers may have or take positions in the securities mentioned in this report and may also perform or seek to perform broking and other investment or securities related services for the corporations whose securities are mentioned in this report as well as other parties generally.

The information provided herein may contain projections or other forward looking statements regarding future events or future performance of countries, assets, markets or companies. Actual events or results may differ materially. Past performance figures are not necessarily indicative of future or likely performance.

Privileged / confidential information may be contained in this document. If you are not the addressee indicated in this document (or responsible for delivery of this message to such person), you may not copy or deliver this message to anyone. Opinions, conclusions and other information in this document that do not relate to the official business of OCBC Bank, BOS, OIR, OSPL and their respective connected and associated corporations shall be understood as neither given nor endorsed..


For and on behalf of OCBC Investment Research Private Limited:

Carmen Lee
Head of Research

Co.Reg.no.:198301152E



Print  Text Size
       Download Full Report
Home | Research | Market Pulse | Technical Analysis | Strategy | ETF | IPOs | Warrants | Bonds | Sector | About Us
© Copyright 2007 - OCBC Investment Research.| All Rights Reserved | Co.Reg.no.:198301152E